B&B and Track employees safely replaced the timber deck Maypole Bridge in September. It required two weeks of work for the Kenton Subdivision’s two main tracks.
B&B Supervisor Juan Morales cited teamwork and excellent job briefings, along with employees’ use of proper PPE such as fall protection.
![](https://beltrailway.com/wp-content/uploads/2023/11/C_IMG_2647_101424-768x1024.jpg)
Employees use a grapple truck.
![](https://beltrailway.com/wp-content/uploads/2023/11/C_IMG_0692_101425-1024x768.jpg)