BRC 381 represents a significant addition to the Belt’s locomotive fleet.
The EMD SD62 was purchased from Union Pacific, brought out of storage and sent to Metro East Industries (MEI) for refurbishment before entering service. General Foreman of Special Projects and Training Rob Soltys managed the project, which also involved MEI painting the unit and outfitting it with a locomotive remote control system.
Prior to being placed into storage by Union Pacific, the main generator, prime mover and air compressor had been rebuilt. That work provided a solid foundation for the refurbishment and allowed MEI to focus on details.
On Dec. 1, 2025, Soltys traveled to MEI’s headquarters in East St. Louis for a final walkthrough and release-to-service testing. BRC 381 was delivered to the Belt the following week via a Union Pacific train.
Soltys said he appreciated the opportunity to see the project’s technical and business sides and is pleased with the strong working relationship it established between the Belt and MEI.
