Roadmaster Tony Balich and his team recently completed a weeklong project near the RIP track’s entrance.
The team straightened a track and replaced a crossing with a concrete surface that will aid its longevity and help maintain the proper alignment.
![](https://beltrailway.com/wp-content/uploads/2023/11/tempImageUypq8T_101421-768x1024.jpg)
A new crossing outside the RIP track
![](https://beltrailway.com/wp-content/uploads/2023/11/tempImage9mkEDU_101422-768x1024.jpg)