A movable frog was installed on a heavy tonnage line recently.
The job necessitated the use of multiple cranes and required extensive planning, a 16-hour outage and 25 Belt employees.
With traffic operating on a track adjacent to the one being worked on, Transportation and Engineering collaborated to keep employees safe and ensure goals were met.